Título : Evaluación térmica de la planta de vapor del Hospital Manuel Ygnacio Monteros del Instituto Ecuatoriano de Seguridad Social IESS de Loja.
Autor : Mahuad Ortega, Daniel Enrique
Blacio Aguilar, Milton Gualberto
Montaño Peralta, Thuesman Estuardo
Palabras clave : <CIRCUITO DE VAPOR><CALDERAS><SISTEMA DE REDUCCIÓN DE PRESIÓN><PÉRDIDAS ENERGÉTICAS>
Fecha de publicación : 2010
Resumen : Los hospitales son consumidores de importante cantidad de energía, por lo que el desarrollar un programa de uso eficiente de energía ayudará a preparar una estrategia para racionalizar la demanda y optimizar la distribución, y a su vez disponer de mejor modo los excedentes. El Hospital del IESS es una institución cuyo objetivo es brindar una cobertura de Salud a sus afiliados, dispone de 120 camas y su edificación cuenta con 20 años de funcionamiento. Los costos para mantenerse con este propósito son altos y preocupan a las autoridades de la Casa de Salud sobre los gastos que se realizan en especial los de electricidad, combustibles y agua. Del análisis de consumo en función de los portadores energéticos se determinó que el diésel 2 es el mayor consumidor con 63%, y está sobre el de electricidad (32%) y gasolina con un 5%. La planta de vapor utiliza en el caldero este combustible que sirve para la combustión y por ende para la generación de vapor por medio de intercambio térmico, donde se pudo apreciar que las instalaciones de transporte adolecen de fallas como tuberías no aisladas, y lo que es más grave aislamientos en mal estado, esto se traduce en el consumo desmedido que no se relaciona con la demanda de pacientes atendidos y camas utilizadas por mes. De la evaluación de pérdidas a las instalaciones de vapor, se determinó que estas alcanzan un valor de 576,41 USD por mes o 6.916,92 USD anual que bien pueden ser eliminadas realizando cambios en las instalaciones cuya inversión está alrededor de los 50.000 USD, lo cual también incidiría en el aporte a la descontaminación ambiental por el excedente de trabajo que tiene la caldera para cubrir la demanda de vapor, contaminación debido a las emanaciones de CO2 por la chimenea de esta máquina generadora de vapor. La recuperación de la inversión se efectuaría a los 7 años, en función de una TIR de 37%. Es necesario adoptar un sistema que conlleve a un manejo racional de vapor como la automatización de purgas así como una adecuada instrumentación que incidirá en el mejor control de la planta de vapor.
Descripción : The hospitals are consumers of important quantity of energy, for what developing a program of efficient use of energy will help to prepare a strategy to rationalize the demand and to optimize the distribution, and in turn to have better way the surpluses. The Hospital of IESS is an institution whose objective is to offer a covering of Health to its members, it has 120 beds and its construction has 20 years of operation. The costs to stay with this purpose are high and they worry to the authorities of the House of Health on the expenses that are carried out those of electricity especially, fuels and it dilutes. Of the consumption analysis in the energy payees' function was determined that the diesel 2 is the biggest consumer with 63%, and it is on that of electricity (32%) and gasoline with 5%. The plant of vapor uses in the boiler this fuel that is good for the combustion and therefore for the generation of vapor by means of thermal exchange, where you could appreciate that the facilities of transport suffer of flaws as non isolated pipes, and what is more serious isolations in not well state, this is translated in the limitless consumption that is not related with the demand of assisted patients and beds used per month. Of the evaluation of losses to the facilities of vapor, it was determined that these they reach a value of 576,41 USD for month or 6.916,92 annual USD that well they can be eliminated carrying out changes in the facilities whose investment this around 50.000 USD, that which would also impact in the contribution to the environmental against contamination for the work surplus that has the boiler to cover the demand of vapor, contamination due to the emanations of CO2 for the chimney of this generating machine of vapor. The recovery of the investment would be made to the 7 years, in function of a TIR of 37%. It is necessary to adopt a system that bears to a rational handling of vapor like the automation of purges as well as an appropriate instrumentation that will impact in the best control in the plant of vapor.
URI : http://dspace.unl.edu.ec/jspui/handle/123456789/13611
Aparece en las colecciones: TRABAJOS DE TITULACION AEIRNNR

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
Blacio Aguilar, Milton Gualberto, Montaño Peralta, Thuesman Estuardo.pdf948,01 kBAdobe PDFVisualizar/Abrir


Los ítems de DSpace están protegidos por copyright, con todos los derechos reservados, a menos que se indique lo contrario.